
Solar Grid Tie 1KW-M11
1100VA/880W rated output. Grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Genuine stock from Nice Power System, Delhi NCR.
Save ₹4,750
Grid-tied solar solutions built to maximise bill savings — Microtek GTI inverters from 1kW for homes up to 50–100kW for commercial rooftops, exporting surplus generation via net metering. Best where the goal is the lowest possible electricity bill rather than outage backup. We handle system design and installation across Delhi NCR.
Home installation · On-site service & AMC across Delhi NCR

1100VA/880W rated output. Grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Genuine stock from Nice Power System, Delhi NCR.
Save ₹4,750

Buy the MICROTEK GTI 5KW-M12 — a grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Home installation & service across Delhi NCR.
Save ₹70,601

Buy the Solar Grid Tie 50KW 3-PH- M32 — a grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Home installation & service across Delhi NCR.
Save ₹2,82,501

Buy the MICROTEK GT 100 KW — a 100 KW grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Home installation & service across Delhi NCR.
Save ₹4,25,951

Buy the Solar Grid Tie 8.8KW 3-PH -M32 — a grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Home installation & service across Delhi NCR.
Save ₹1,37,901

Buy the MICROTEK GT 250 KW — a 250 KW grid-tied solar inverter that exports surplus solar to cut your electricity bill through net metering. Home installation & service across Delhi NCR.
Save ₹5,55,151
This is the distinction that matters most and the one most often blurred. A grid-tied system exports surplus generation to the grid and nets it off your bill. It gives the best financial return of any solar option because there is no battery to buy or replace. It also gives you no backup at all — when the grid fails, a standard grid-tied inverter shuts down and your house goes dark with everyone else's.
That shutdown is a safety requirement, not a fault: it stops the system energising lines that a lineman may be working on. If continuity through cuts is what you actually want, you want a PCU or a hybrid, and you should decide that before quoting panels.
The economics rest on your DISCOM's net-metering arrangement, and the paperwork is a real step with a real timeline: application, approval, a sanctioned capacity limit tied to your existing connection, and a bidirectional meter installed by the DISCOM. Which rules apply depends on your connection and your distribution company.
The system capacity you are allowed to install is usually constrained by your sanctioned load, so that figure on your bill sets the ceiling before roof space does. We handle the design and guide the net-metering paperwork across Delhi NCR, because a system that is installed but not yet metered is not saving anything.
The value of a unit you consume yourself is different from the value of a unit you export, and the export rate is set by the DISCOM rather than by you. That means a system sized to your daytime usage generally pays back faster than one sized to fill the roof.
So the sizing input is your consumption pattern: what runs during daylight, on which days, in which seasons. A shop drawing steadily through the working day and a flat that is empty until evening justify very different systems on identical roofs. Bring your last few bills and the answer follows from them.
A credible payback estimate is built from your bill, your roof survey, your DISCOM's rules and the subsidy you actually qualify for. It should include a derate for Delhi's dust and smog, and it should account for replacing the grid-tied inverter once during the panels' life — the panels outlast it comfortably.
Be sceptical of a figure produced before anyone has seen your bill or your roof. The inputs that move payback most are your own consumption and your shading, and neither can be guessed from the street. We survey first and quote second.
Free, no-jargon advice from our Ashok Vihar shop to help you choose.
It offsets daytime grid power and, with net metering, credits the surplus you export against what you import — directly lowering your bill.
Standard grid-tied systems shut off during outages for safety. If you need backup during cuts, choose a hybrid PCU system instead — we'll explain the trade-off.
From 1kW home systems to 50kW and 100kW commercial plants (GTI M-series). We'll size it to your roof and consumption.